
Finally, after 3½ months, our driveway has asphalt. We hired another company as the first company, the one that removed the old asphalt and put down a layer of crushed rock, wasn’t returning our phone calls. They did have $500 from us, though, so I figure we have kept up our end of the contract.
I signed the contract with Burl-Oak Paving on Tuesday and 9 guys (“all from the same village in Newfoundland”) came out to do the work today (Saturday). It took them about 2 hours with about ½ hour spent waiting for the asphalt truck. Now, in 4 or 5 days, I’ll be able to drive straight into the garage with no “bumps in the road.”
My next youngest brother, living in Victoria, had his birthday today. I woke him up at 09:00 his time to wish him a “Happy.” Apparently they stayed up Friday night to finish watching a movie they’d rented. I wasn’t too sympathetic as I had been up since 07:00 this morning not knowing when exactly the paving guys would be coming.
Today’s run was a scorcher: it was so humid that my “sta-dri” shirt was soaked by the end of the hour. My time was a couple of minutes slower, too — probably because I had to wipe the sweat off my brow periodically and drink some water.
Copyright © 2002-2006 James (Jim) R. R. Service (@gmail.com - jservice)